Charlotte, NC
Construction Cost: $21.8 Million
Project Size: 8,840 SF
Construction Cost: $21.8 Million
Project Size: 8,840 SF
Central Energy Plant is a two-story addition that includes the addition of three chillers, one replacement chiller, and three new generators, along with associated automatic transfer switches, paralleling gear etc. Water pumps were replaced along with most of the chilled water piping. Hot water generators were replaced along with all of the existing cooling towers. This project was completed in conjunction to the F-Wing and G-Wing Additions.